go backBack

Building Development Division

Resubmissions After Comments

  • All building plan resubmissions are required to be submitted via Prince William County’s ePortal system. Consult the Customer Electronic Plan Review (ePlans) Guide for information on how to prepare and submit documents for electronic plan review and the electronic plan review guide for building ePlan submission guidelines.
  • All requirements of the pre-submission checklist remain in effect for resubmission.
  • If the resubmission alters sheet numbers, a new pre-submission checklist is required. Also coordinate changes with the drawing index on the cover sheet.
  • Reminder: resubmissions are subject to credential guidelines. Electronic designer seals, signatures, and dates are required in accordance with Virginia regulations.
  • A cover letter is required for resubmission. The cover letter(s) shall contain the project name, number, address, and an itemized response to each of the numbered comments from the reviewer(s). A copy of the comments from the reviewer(s) must be attached to the cover letter. See the Building Development Policy 2.3 Resubmission-Revision Cover Letter for more information. Use the Resubmission - Revision Cover Letter for Commercial Projects.
  • Plan resubmissions will be quality control checked.
  • Fees for resubmissions will be due at the time of plan resubmission, and are listed in the approved Building Development Fee Schedule